Projects Montrose United Methodist Church

Restoration Project - Competitve Bid

  • Removed shingles, wall siding, flat roof membranes
  • Re-sheathed decking the replaced asphalt shingles with new architectural laminated shingles
  • Installed wood shingle siding
  • Installed Duro-Last TPO membrane to all flat roof decks of bell towers and other upper flat roof decks.

Specialty Dome Roof

  • Repaired structure and installed new sheathing of dome roof
  • Fully-adhered Duro-Last TPO membrane to dome roof
  • Installed copper flashing detail
RETURN TO PROJECTS
877-295-3281